Anodized Aluminum profiles for window

We have a professional R&D team to design custom parts for your extrusion needs, and we have a lot of ready-made molds that can save your cost and time. We offer ODM/OEM service, CAD Drawing and mould design base on your sample. 10-15 Days for mould production and sample testing, with refundable mould cost. Mould test and sample verification before mass production.

Product namae: | OEM factory price extruded aluminum profile for window and door |
Material Grade: | Aluminum Alloy 6000 series:6063,6061,6060,6005 |
Temper: | T3-T8 |
Finish: | Anodised, powder coated, sandblasting, electrophoresis ,titanium Powder coating, Polish, Brushed, PVDF coating, wood-grained etc. |
Color: | Silvery white, black, golden, champagne, dark bronze or according to your requirement |
Shape: | Square, Round, Flat, according to customers' drawings |
Thickness: | Above 0.8mm,the thicker the better |
Mould: | 1. You can use our free mould 2. We open new mould as your drawing, it is free until your quantity enough. 3. The mould development time is usually 10 days. |
Price | Aluminium Ingot price + processing Fee |
Specification: | A. Length: ≤6.3m B. Normal Wall thickness: ≥1.0mm C. Normal Anodizing thickness: ≥10µm D. Normal powder coating thickness: 60-120µm E. Tensile strength: ≥160mpa F. Yield strength: ≥110mpa G. Extensibility: ≥8% H. Hardness(HW): 8-15 |
Product Type: | We customize: extruded Aluminum profile of windows & doors frame,aluminum thermal break profile,curtain wall, aluminium shutter, aluminium partition profile, greenhouse profile, louver profile, aluminium industry profile, aluminum pipe,aluminium tube, U profile, T profile, etc |
Applications: | Aluminum window and door, office partition,construction aluminum profile,aluminum pipe,industrial,Medical armrest/handrail, shutter, louver,garage door, curatin wall, sliding door, wardrobe door, kitchen cabinet,Aluminum curtain rail,aluminum hinge,aluminum rail |
Packing details | Kraft paper, EPE Fram, Shrink film, Composite paper or as your need |
MOQ: | Based on Size, 0.5-10tons |
Delivery time: | 15-30 days if the mould is ready |
Normal order sequence: | 1. Confirm the drawings, colors and price 2. Pay the mould fee and we start to make moulds 3. We send samples to you for your confirmation 4. Make the payment of 30% deposit, start production 5. Delivery |


