Ground Mount Solution

Short Description:

Ground Mounted PV Racking Systems are specially designed for large commercial and public utility power stations. Labor cost and installation time can be reduced because of pre-assembled support.


Product Detail

Video

Material    Solar Rack System
Surface Treatment    Average Anodizing Coating Thickness≥ 12μm AverageHot-galvanized Coating Thickness≥ 65μm
Panel Type    Framed & Frameless
Wind Load    ≤60m/s
Snow Load   1.4KN/m2
 Panel Orientation    Landscape/Portrait
 Tilt Angle    0°~60°
Seismic Load    Lateral seismic factor: Kp=1;  seismic coefficient: Z=1; Use coefficient: I=1
Standards    JIS C 8955 : 2017AS/NZS 1170DIN1055ASCE/SEI 7-05
International Building Code: IBC 2009
 Warranty   15years quality warranty, 25years life span warranty

 

FOEN Ground Mount 1 Solution

1

FOEN GM1 Solution is specially designed for large scale ground solar projects, and can work with concrete bases or ground screws depending on different soil condition.The pre-assembled lightweight aluminium structure brings you quicker and safer installation.

Technical Parameter:

Installation Site:  Open Ground
Foundation: Ground Screw/ Concrete Bases
Panel Orientation: Landscape/Portrait
Tilt Angle: 0º-60º
Wind Load: ≤60m/s
Snow Load: ≤2500mm
Seismic Load: Lateral Seismic Factor:Kp=1;Selsmic Coefficient;Z=1;
Use Coefficient; 1=1
Standards: JIS C 8955;2017;AS/NZS 1170;DIN 1055;ASCE/SEI 7-05;
International Building Code; IBC 2009
Surface Treatment : Aluminium Profiles:average coating thickness≥12um
Galvanized Profiles:average coating thickness≥75um
Safety & Reliablity Checked & tested structure strictly for the use in extreme weather and geographical conditions.
Quick Installation: Highly pre-assembled design with quicker and simpler installation
Warranty:  15years’ warranty,25years’ life span

 

Components List

FOEN Ground Mount 1 Solution-5

1.Inter Clamp Kit
2.T Rail Connector
3.T Rail
4.End Clamp Kit
5.T-Rail Clamp
6.Ground Screw
7.GM 1 Pre-assembled Support
8.Bolt M12x40

Installation Steps
Universal Engineering
Supply Ability
Packaging & Delivery
Lead Time 
Installation Steps

1.Ram Screws into Ground as Planned
2.Install the Pre-assembled Support
3.Install T Rail
4.Install Solar Panels
5.Installation Completed

Universal Engineering

• Structural design to consider all applicable codes and local regulations, design loads, applicable weather hazards and other
regional date.
• Site-specific system statics calculation.
• Calculation for wind load, snow load.

Supply Ability

1000000.0 Watt/Watts per Month ground solar mounting bracket / racking / stand for resident use

Packaging & Delivery

Packaging Details
Chiko Standard Carton,Wooden Pallet or Other customized packages for ground Solar Mounting Brackets/Solar Mounting Racking
Port:FUZHOU,CHINA

Lead Time 
Quantity(Watts) 1 - 10000000 10000001 - 50000000 >50000000
Est. Time(days) 10 30 To be negotiated

FOEN Ground Mount 2 Solution

4

FOEN GM 2 Solution is sepcially designed for large scale mountainous and sloped areas, tolerance for any kind of non-stone soil, this system has its pole column as foot which is firmly rammed into ground.

Technical Parameter

Installation Site: Mountainous and sloped areas
Foundation: Pile Foundation
Panel Orientation: Landscape/Portrait
Tilt Angle: 0º-60º
Wind Load: ≤60m/s
Snow Load: ≤2500mm
Seismic Load: Lateral Seismic Factor:Kp=1;Selsmic Coefficient;Z=1;
Use Coefficient; 1=1
Standards: JIS C 8955;2017;AS/NZS 1170;DIN 1055;ASCE/SEI 7-05;
International Building Code; IBC 2009
Surface Treatment : Aluminium Profiles:average coating thickness≥12um
Galvanized Profiles:average coating thickness≥75um
Safety & Reliablity Checked & tested structure strictly for the use in extreme weather and geographical conditions.
Quick Installation: Highly pre-assembled design with quicker and simpler installation
Low Cost: Well installed solar solution on mountainous/slope without extensive land leveling,save your onsite cost.
Warranty: 15years’warranty,25years’life span

 

Components List

FOEN Ground Mount 1 Solution-6

1.Inter Clamp Kit
2.T Rail Connector
3.T Rail
4.Gm2 Pre-assembled Support
5.T joint
6.Post Joint
7.C post
8.Adjustable Joint
9.End Clamp Kit

Installation Steps
Universal Engineering
Supply Ability
Packaging & Delivery
Lead Time
Installation Steps

1.Ram C Post into Ground as Planned
2.Install T joint onto Top of C post
3.Install Post Joint
4.Install Pre-assembled Support
5.Install Adjustable Joint on Support
6.Install T Rail on Top of Pre-assembled Support
7.Install Solar Panels onto T Rails
8.Installation Completed

Universal Engineering

• Structural design to consider all applicable codes and local regulations, design loads, applicable weather hazards and other regional date.
• Site-specific system statics calculation.
• Calculation for wind load, snow load.

Supply Ability

1000000.0 Watt/Watts per Month ground solar mounting bracket / racking / stand for resident use

Packaging & Delivery

Packaging Details
Chiko Standard Carton,Wooden Pallet or Other customized packages for ground Solar Mounting Brackets/Solar Mounting Racking
Port:FUZHOU,CHINA

Lead Time
Quantity(Watts) 1 - 10000000 10000001 - 50000000 >50000000
Est. Time(days) 10 30 To be negotiated

  • Previous: